Canal Widening (Bukit Timah and Dunearn)

Project Type: Infrastructure

Designed By: Public Utilities Board

Applications:Stair Railings, Facade, Bridge, Public Infrastructure

The Public Utilities Board (PUB) is undertaking a flood protection initiative to widen and deepen the stretch of Bukit Timah Canal from Rifle Range Road to Jalan Kampong Chantek, increasing the canal's rainwater capacity. The upgrade addresses flash flood risk in the Bukit Timah area, which is prone to overflow after heavy and intense rain.

Supply Bay supplied round aluminium perforated metal panels as custom perforated metal screens for bridge railings and privacy screens along the canal. The perforation pattern provides visibility and ventilation while maintaining a secure barrier, suited to pedestrian bridges, canal crossings, and public walkways. The material's corrosion resistance and low-maintenance profile support the project's requirements for long-term outdoor performance, while its adaptability to custom perforation specifications addresses both structural integrity and visual appeal on a public infrastructure project.


Featured Products

Round-2 - Perforated Metal Sheet
$0.00

Round-2 is part of the Supply Bay Perforated Metal collection.

Round-2 is a round patterned perforated metal manufactured in staggered lines. Staggered patterns place the holes out of alignment, creating movement and visual directionality that organises a space, draws the eye, and breaks up large areas. In addition to their utility, our perforated metals are available in several standard finishes to complement most interior decorating styles.

Available in industry-standard 4ft by 8ft sheets.

Previous
Previous

Christ Methodist Church

Next
Next

Pedestrian Linkway