Project Type: Commercial Development





Project Type: Commercial Development
Designed By: Heatherwick studio (Design Partner); Architects 61 (Local Partner); SAA and RSP Architects Planners & Engineers (Local Sub-Consultants); Field Operations (Landscape Architect); Arup Singapore Private Limited, Mott McDonald, and Surbana Jurong (Engineers); DP Architects Pte Ltd (Retail Design)
Applications: Structural in-wall mesh, Maintenance Walkway
Changi Airport Terminal 5 is a major aviation infrastructure development by Changi Airport Group (CAG), set within the 1,080-hectare Changi East development, expected to handle around 50 million passengers annually. T5 will connect to Changi Airport's existing terminals, positioning the airport to operate as an integrated air hub, with its first phase slated to open in the mid-2030s.
Supply Bay supplied expanded metal walkway mesh for structural walkway and in-wall applications on the project. Changi Airport Group’s Terminal 5 project overview gives the broader development context.
(Photo credits: Changi Airport Group)

W50-075 is part of the Supply Bay Expanded Metal [Walkway Mesh] collection.
It is meant for heavy duty applications with load-bearing qualities, perfect for drain gratings and staircases.
Available in industry-standard 4ft by 8ft sheets.

W50-080 is part of the Supply Bay Expanded Metal [Walkway Mesh] collection.
It is meant for heavy duty applications with load-bearing qualities, perfect for drain gratings and staircases.
Available in industry-standard 4ft by 8ft sheets.